What the buyer needs
AI summaryFirms must also provide fee structures for the Preliminary Engineering Report and subsequent design services, along with proof of Errors and Omissions Insurance. The draft PER is due January 16, 2027.
Scope of work
- Preliminary engineering design services for a potential FY27 CDBG project
- Preparation of a draft Preliminary Engineering Report
- Design services if the project is funded
- Construction Management Services if the project is funded
- Improvements to the city sewerage system
- Improvements to street and drainage
How proposals are evaluated
| Criterion | Weight / scoring |
|---|---|
| History of the firm and resources | Not specified |
| CDBG/EIP/RDF experience, including other DCA grant programs | Not specified |
| Key personnel/qualifications | Not specified |
| Current workload | Not specified |
| Scope and level of service proposed | Not specified |
| Experience with similar projects and a list of references | Not specified |
| Fees and/or Percentages (if any) associated with the Preliminary Engineering Report, Design, and Construction Management Services | Not specified |
Minimum qualifications
- Technically qualified and licensed in the State of Georgia
- Strong record of assisting local governments in implementing Community Development Block Grant (CDBG) programs
Documents to include with your response
- History of the firm and resources
- CDBG/EIP/RDF experience, including other DCA grant programs
- Key personnel/qualifications
- Current workload
- Scope and level of service proposed
- Experience with similar projects and a list of references
- Fees and/or Percentages associated with the Preliminary Engineering Report, Design, and Construction Management Services
- Errors and Omissions Insurance proof
- Statement of Qualifications Form
How to submit
- Instructions
- Questions, Statement of Qualifications, and proposal packages should be submitted to Bethany Newby, 5405 Oak Street, Eastman, GA 31023.
