What the buyer needs
AI summaryParks Canada requires roadside vegetation management, brushing, clearing, and isolated tree removal services along designated sections of the Trans-Canada Highway in Yoho National Park, Highway 93 North in Banff National Park, and Highway 93 North in Jasper National Park.
The work includes removing grass, brush, shrubs, and small trees within specified highway rights-of-way to improve highway safety by maintaining sightlines and reducing hazards.
Bids must be submitted via fax or email to [email protected] or 1-855-983-1808; bids received in-person or by courier will not be accepted.
The contractor shall perform and complete the work no later than March 31, 2027.
Scope of work
- Mobilization and demobilization of equipment, materials, and resources
- Brushing: removal of small trees, shrubs, brush, and vegetative growth
- Close cut clearing: cutting standing trees, brush, scrub, and salvage timber
- Isolated tree removal for trees larger than 150mm diameter
- Disposal of fallen timber and surface debris
- Chipping and mulching of trimmed vegetation
- Vegetation management in Yoho, Banff, and Jasper National Parks
- Traffic management during operations
How proposals are evaluated
| Criterion | Weight / scoring |
|---|---|
| Indigenous Participation Plan | Not specified |
Minimum qualifications
- Must obtain and maintain a valid Parks Canada business license for Yoho, Banff, and Jasper National Parks
- Must obtain and maintain a valid Parks Canada Restricted Activity Permit
- Equipment must be fitted with rubber tracks/tires
- Contractor must adhere to environmental regulations
- Contractor must monitor avalanche conditions and implement safety plans
- Staff must have working knowledge of Occupational Health and Safety Guidelines
- Must use PPE correctly
- Must provide a properly maintained first aid kit on site
Documents to include with your response
- Health and Safety and Emergency Response Plan
- Spill Response Plan
- Confirmation of active business license(s)
- Work Schedule
- Restricted Activity Permit
- Vehicle information for site access
- Traffic Management Plans
- Avalanche Risk Management Plan
How to submit
- Method
- Fax or Email
- Instructions
- Bids received by fax or email will be accepted. Do not submit via SAP Ariba. Email submissions to [email protected]. Maximum email file size is 15MB; send multiple emails if necessary.
