Write 1 complete proposal every month, free.

RFP opportunitySolicitation STU M185-017

Town of Castle Rock Fifth Street Improvements Civil Design Services

Submission deadlineDec 1, 2026See documents for time and submission instructions
0 of 5 free RFP views today
FREE AI PROPOSAL WRITING

Write a proposal for this RFP.Start free in one click.

1 proposal a month on Free · No credit card requiredCreate a free account to continue with this RFP.

Team preparing a proposal together
This RFP. Your next proposal.Analyze the requirements. Build your outline. Write with AI.

About this opportunity

AI summary

The Town of Castle Rock requires civil design services for the Fifth Street Improvements project from Woodlands Boulevard to Four Corners. The requested scope includes transportation planning and roadway design, hydraulics and storm drainage, water quality detention ponds, sanitary sewer utilities, structural engineering, traffic analysis, pedestrian facilities, survey mapping, legal property descriptions, geotechnical and pavement design, traffic control plans, and environmental permitting. The project incorporates specifications for portable message sign panels, which contractors must furnish, operate, maintain, and deliver to the site at least ten days prior to roadway work. Participation is restricted to onshore USA organizations performing onsite work, and the buyer is seeking proposals.

Buyer and opportunity details

Client
TOWN OF CASTLE ROCK
Solicitation No.
STU M185-017

Scope of work

  • Protection of migratory birds and biological raptor nest surveys
  • Subgrade stabilization with cementitious stabilization agent
  • Concrete block facing walls and architectural/graffiti resistant treatments
  • Duplex coating system and repair of galvanized products
  • Installation of electrical conduit and pull boxes
  • Installation, splicing, and testing of single mode fiber optic cable
  • Furnishing, operating, and maintaining portable message sign panels
  • Traffic control and detour pavement

Minimum qualifications

  • Contractor's wildlife biologist must have a minimum of three years' experience conducting migratory bird surveys and implementing MBTA requirements
  • Fiber optic cable manufacturer shall be ISO 9001 or TL 9000 registered

Documents to include with your response

  • Documentation of the biologist's education and experience
  • Records of protected nest locations, bird species, protection methods, and installation dates
  • Example field calculation sheet attached to method statement for cement application
  • Report and Certification for Concrete Block 28 Day Compression Strength and Water Absorption Rate
  • Efflorescence and Freeze and Thaw Test reports and certifications from an independent laboratory
  • Printed Technical Data Sheets for duplex coating repair materials and paint systems
  • Detailed fiber optic installation and splicing Method Statement and schedule
  • Two copies of the fiber optic cable manufacturer's installation instructions and cable data sheets

Contract details

Place of performance
Fifth Street from Woodlands Blvd to Four Corners, Castle Rock, Colorado
Funding
Federal-Aid Highway Funding
PRODUCT DEMO

How AI proposal writing works.

Analyze the RFP, build an outline, write and submit.

CRAXY AI IN ACTION — example proposal

Make a more informed bid decision.

Analyze the solicitation against your company profile. See your matching score, strengths, risks and the submission checklist before investing in a response.

Start my proposal freeActual product screens · Example proposal
AI PROPOSAL WRITING

Write your response to this RFP.

Create a draft using the solicitation and your company documents.

Start my proposal free1 proposal a month on Free · No credit card required