Write with Gemini 4 Hydrogen — ~40% less drafting time and over 5× fewer fabricated claims.

OpenSolicitation QBS/PS/DOT/2609-1270086

City of Atlanta Marietta Road Bridge Replacement Over CSX Railroad - Phase I

Buyer
City of Atlanta
Place of performance
Marietta Road Bridge over the former CSX Tilford Yard, Atlanta, Georgia
Submission deadline
Nov 23, 20262:00 PM EST

Draft your response

Create a free account to draft a response using this RFP and your company documents.

1 proposal a month on Free · No credit card required

Team preparing a proposal together
0 of 5 free RFP views today

What the buyer needs

AI summary

The City of Atlanta is soliciting Statements of Qualifications for the Marietta Road Bridge Replacement Project. This project involves replacing the Marietta Road Bridge over CSX Railroad. Phase I of this solicitation evaluates offerors' qualifications, experience, and responsiveness. Evaluation criteria include the prime's experience, qualifications, resources, and workload capacity. Firms must demonstrate their ability to obtain required insurance coverages. This includes Commercial General Liability, Automobile Liability, Excess or Umbrella Liability, and Professional Liability Insurance. Award will be made to the most responsible and responsive offeror meeting eligibility requirements. Offerors eligible for award must provide a signed contract, affidavit, bid bond if applicable, and certificate of insurance.

Scope of work

  • Replacement of the distressed existing 423.5 feet long 5 span concrete box beam Marietta Road bridge with a new structure
  • New pavement, curb, and gutter
  • Continuous, 5-foot sidewalk on each side of the bridge
  • Continuous standard 5-foot sidewalk along Marietta Road from south of the bridge to Perry Boulevard/West Marietta Street (approx. 0.8 mile segment)

How proposals are evaluated

CriterionWeight / scoring
Prime's Experience and Qualifications (Phase I)30%
Prime's Resources, and Workload Capacity (Phase I)20%
Technical Approach (Phase II)40%
Past Performance (Phase II)10%

Minimum qualifications

  • The Prime Consultant MUST be prequalified by GDOT in the listed area classes
  • Subconsultants MUST be prequalified by GDOT in the listed area classes for their assigned work

Documents to include with your response

  • Area Classes Summary Form
  • FTA Federal Clauses
  • Georgia Security and Immigration Compliance Act Affidavit
  • Certification Form
  • Attestation of Financial Capability / Acknowledgment of Attestation
  • Signed and dated letter from insurance broker or Certificate of Insurance
  • OCC Requirement - Form 1 - Covenant of Non-Discrimination
  • OCC Requirement - FORM 2 - Good Faith Efforts
  • OCC Requirement – FORM 3 – Subcontractor Utilization Plan
  • OCC Requirement – Letter(s) of Intent

How to submit

Method
Electronic via ATLCloud
Instructions
Submissions are due via ATLCloud at the time and date specified. Responses for Phase I must be formatted in accordance with the Submittal Format document.