What the buyer needs
AI summaryThe City of Peachtree Corners seeks a comprehensive, citywide Safety Action Plan to eliminate traffic fatalities and serious injuries. The plan will align with USDOT’s Safe Streets and Roads for All (SS4A) Action Plan requirements and Safe System principles. Proposals are due December 18, 2026, by 4:00 PM EST. Questions must be submitted via email by December 9, 2026, 4:00 PM EST. The City will evaluate proposals based on methodology, schedule, project staff, and similar experience. Interviews may be conducted with top-ranked firms.
Scope of work
- Develop an adopted leadership commitment statement and formalized goal to eliminate fatalities and serious injuries.
- Conduct a systemwide analysis of 5-7 years of crash data and develop a High Injury Network.
- Publish crash data, land use, and infrastructure maps online and in the City's app.
- Review existing policies and standards and recommend speed management and multimodal safety changes.
- Develop a prioritized project pipeline and concept designs for 2-5 demonstration or quick-build treatments.
- Identify funding pathways, bundling strategies, and a 1-3-5 year delivery roadmap.
- Establish performance measures, dashboard specifications, and an annual reporting structure.
- Produce draft and final Safety Action Plan, including public review cycles and formal adoption.
How proposals are evaluated
| Criterion | Weight / scoring |
|---|---|
| Methodology | 30 |
| Schedule | 15 |
| Project Staff | 25 |
| Similar Experience | 30 |
Minimum qualifications
- Prepared under the guidance of a professional Consultant.
- In accordance with AASHTO, Georgia Department of Transportation, and Gwinnett County Department of Transportation Design Policies.
- No fewer than three project references completed in the last five years similar in size and scope.
Documents to include with your response
- Cover Letter (one page, signed by an authorized officer)
- Project Summary
- Methodology
- Proposed Schedule (GANTT chart styled schedule and narrative)
- Project Staff
- Similar Experience (at least three project references)
- Exhibits (Addenda Signature Pages, Project Staff's Resumes, DBE Commitment Letters)
How to submit
- Method
- FTP, hard copy, or email (electronic submissions encouraged)
- Instructions
- Submit to James Nguyen, PE at City of Peachtree Corners, 310 Technology Parkway, Peachtree Corners, Georgia 30092 or electronically. Hard copies must include an electronic version on a flash drive. Maximum 10 one-sided 8.5x11 pages (excluding cover page, table of contents, and exhibits), 12-pt font.
