Write 1 complete proposal every month, free.

RFP opportunity

City of Marshfield Citywide Traffic Signal System Modeling and Analysis Services

Submission deadlineNov 25, 2026See documents for time and submission instructions
0 of 5 free RFP views today
FREE AI PROPOSAL WRITING

Write a proposal for this RFP.Start free in one click.

1 proposal a month on Free · No credit card requiredCreate a free account to continue with this RFP.

Team preparing a proposal together
This RFP. Your next proposal.Analyze the requirements. Build your outline. Write with AI.

About this opportunity

AI summary

The City of Marshfield Board of Public Works is requesting proposals from qualified consulting engineering firms to conduct a citywide traffic signal system study. The selected consultant will perform data collection, signal warrant analysis, signal timing and phasing optimization, progression analysis, and hardware deficiency evaluations for designated intersections. Additional scope includes obtaining WisDOT approval, installing revised timing plans, conducting field reviews, preparing a final report, and presenting the results to the City. Only onshore US organizations are eligible to submit proposals. The assigned Project Manager or Lead Traffic Engineer must possess at least five years of traffic signal engineering experience, and firms must satisfy the City's minimum insurance coverage requirements. Proposals must be submitted digitally via email to [email protected] no later than November 25, 2026, at 2:00 PM. Written questions are accepted via email until the same deadline. City staff will evaluate proposals based on criteria including the firm's understanding of requirements, qualifications, pertinent experience, and references.

Buyer and opportunity details

Client
City of Marshfield Board of Public Works

Scope of work

  • Project management, coordination, kick-off meeting, and progress review meetings
  • Collect eight hours of peak traffic, pedestrian, bicycle, and vehicle classification counts
  • Develop optimized signal timing, phasing plans, and progression analysis
  • Evaluate five unsignalized intersections for traffic signal warrants and roundabout strategies
  • Analyze emission and fuel consumption reductions for Carbon Reduction Program compliance
  • Prepare draft and final reports and make a public presentation to the Board of Public Works
  • Obtain WisDOT approval and install revised timing and phasing plans in the field
  • Perform a follow-up field review approximately four weeks after implementation

How proposals are evaluated

CriterionWeight / scoring
Adherence to requirements of the RFPNot specified
Consultant's understanding of the project requirementsNot specified
Pertinent experience, qualifications, and references of the project teamNot specified

Minimum qualifications

  • Project Manager and/or Lead Traffic Engineer shall have a minimum of five years experience in traffic signal systems design and analysis

Documents to include with your response

  • Statement of consultant's understanding of project requirements
  • Description of technical approach, task sequence, benchmarks, and milestone dates
  • Resumes of key design staff including Project Manager and Lead Traffic Engineer
  • Statement regarding non-substitution of key personnel without prior City approval
  • Description of similar project experience involving key proposed staff
  • Client references including names, addresses, and phone numbers
  • Designation of single point of contact
  • Proposed use of City staff, equipment, materials, or data
  • Proposed services to be sub-consulted and anticipated sub-consultants
  • Proposed project schedule with key milestone dates

Key dates

Questions due
November 25, 2026
Proposals due
November 25, 2026, 2:00 PM
Staff evaluation of proposals
Nov. 30 – Dec. 4, 2026

How to submit

Method
Electronic via email
Instructions
Submit a PDF version of the proposal via email labeled Proposal for Engineering Services – WisDOT ID 1009-45-71. Respondent's email and telephone numbers must be included.

Contract details

Place of performance
City of Marshfield, Wisconsin
Insurance and bonding
Certificate of Insurance naming City of Marshfield as additional insured, Automobile Liability on Any Auto basis, Workers Compensation with waiver of subrogation, and continued coverage for 2 years after final acceptance.
Funding
Federal funding via Wisconsin DOT Carbon Reduction Program (CRP) subprogram # 206, 23 U.S.C. 112, Wis. Stat. § 66.0901, and 23 CFR 172
PRODUCT DEMO

How AI proposal writing works.

Analyze the RFP, build an outline, write and submit.

CRAXY AI IN ACTION — example proposal

Make a more informed bid decision.

Analyze the solicitation against your company profile. See your matching score, strengths, risks and the submission checklist before investing in a response.

Start my proposal freeActual product screens · Example proposal
AI PROPOSAL WRITING

Write your response to this RFP.

Create a draft using the solicitation and your company documents.

Start my proposal free1 proposal a month on Free · No credit card required