About this opportunity
AI summaryThe City of Sedalia requires an onshore US vendor to install electrical service onsite in Sedalia, Missouri. The scope entails providing one 400-amp, 120/208-volt, three-phase meter stand with two 200-amp breakers and one 200-amp, 208-volt, three-phase power feed for a glass pulverizer terminating at an equipment rack with a main shut off. The contractor must also supply all necessary conductors, conduit, fittings, connections, supports, materials, grounding, and bonding. The selected contractor must coordinate service requirements, metering, and connection with the electric utility, while the city covers the associated utility fees. Additionally, the contractor must secure required permits, handle inspections, test the installation, and verify compliance with utility standards and electrical codes. All questions regarding this opportunity must be submitted no later than November 13, 2026.
Buyer and opportunity details
- Client
- The City of Sedalia
- Solicitation No.
- 2027-012
Scope of work
- A rack with main shut off to terminate the 200 amp 3 phase feeder for the Glass Pulverizer
