Write with Gemini 4 Hydrogen — ~40% less drafting time and over 5× fewer fabricated claims.

Open

Portland International Airport Fire Protection Sprinkler and Dry Valve Replacements

Buyer
See solicitation
Place of performance
Portland International Airport, Portland, OR
Submission deadline
Dec 9, 2026

Draft your response

Create a free account to draft a response using this RFP and your company documents.

1 proposal a month on Free · No credit card required

Team preparing a proposal together
0 of 5 free RFP views today

What the buyer needs

AI summary

The government authority in Portland, Oregon seeks a contractor to perform fire protection replacements at Portland International Airport. The scope includes replacing pre-action sprinkler systems in the terminal building's north-to-south utility tunnel and replacing several dry valves across the campus. Specifically, the contractor must remove existing fire protection pipe, sprinklers, and accessories in zone T-N-UT-3-PA and install an NFPA 13 compliant system. The work also requires replacing the pre-action cabinet with an NFPA 13 compliant double interlocked stacked valve assembly and compressor or a new double interlocked pre-action cabinet, and protecting electrical distribution routed through the tunnel. Only onshore organizations based in the United States are eligible to bid, and the authority is currently looking for proposals. A pre-bid meeting will take place on November 23, 2026, and all questions must be submitted no later than November 27, 2026.

Scope of work

  • Replace pre-action sprinkler systems in the terminal building utility tunnel
  • Replace several dry valves throughout the campus
  • Remove existing fire protection pipe, sprinklers, and accessories for zone T-N-UT-3-PA
  • Replace zone T-N-UT-3-PA system with an NFPA 13 compliant system
  • Remove and replace pre-action cabinet (T-N-UT-3-PA) with NFPA 13 compliant double interlocked assembly
  • Provide protection for electrical distribution routed through the tunnel