OpenSolicitation RFP884

Request for Proposals for Uninterruptible Power Supply (UPS) Replacement

Buyer
Atlanta Regional Commission
Place of performance
229 Peachtree Street NE, Suite 100, Atlanta, GA 30303
Submission deadline
Nov 19, 20265:00 PM EST

Draft your response

Create a free account to draft a response using this RFP and your company documents.

1 proposal a month on Free · No credit card required

Team preparing a proposal together
0 of 5 free RFP views today

What the buyer needs

AI summary

The Atlanta Regional Commission seeks proposals to furnish, deliver, install, and commission one three-phase Uninterruptible Power Supply (UPS) to replace its existing unit. The work must be completed by December 31, 2026.

Scope of work

  • Furnish and deliver one three-phase, 40 kVA minimum, 480 VAC double-conversion UPS with batteries and network management card
  • Site survey to verify existing conditions, conductors, breakers, and clearances before ordering
  • Rigging and placement through a 36-inch-wide doorway, including freight elevator coordination
  • Disconnection, removal, and lawful disposal or recycling of existing UPS and batteries with disposal certificates
  • Electrical connections by a Georgia-licensed electrical contractor with City of Atlanta permits and inspections
  • Factory-authorized startup, commissioning, and load-bank or live-load test report
  • After-hours or weekend cutover with an ARC-approved written plan
  • On-site staff training, as-built drawings, manuals, and warranty documents

How proposals are evaluated

CriterionWeight / scoring
Price30%
Schedule30%
Technical compliance30%
Qualifications10%

Minimum qualifications

  • Factory-authorized dealer or service provider
  • Georgia-licensed electrical contractor for electrical installation
  • Three references for comparable three-phase UPS installations in the past five years
  • Participation in E-Verify per O.C.G.A. 13-10-91
  • Guaranteed completion date of December 31, 2026

Documents to include with your response

  • Legal firm name and point of contact information
  • Manufacturer, model number, capacity, and spec sheets for UPS, batteries, and bypass
  • Statement confirming compliance with Exhibit A or list of exceptions
  • Lead time and completion schedule
  • Evidence of factory authorization and Georgia electrical license number
  • Three references for comparable installations
  • Completed Exhibit B Price Form
  • Notarized Georgia Security and Immigration Compliance Act Affidavit (Contractor Affidavit) with E-Verify number
  • Contractor/Vendor Information Form
  • Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion and Lobbying

How to submit

Method
Electronic via the ARC procurement website portal
Instructions
Submit as one combined PDF or Word file; vendor registration and approval required prior to submission; only latest upload kept.